Building Renovation Tracker
Positional accounts — set a new password when the position turns over.
Changes apply to the live site for everyone. Save when you're happy with the preview.
Project and Volunteer hours are built in. Add your own (e.g. "Floor plans & schematics").
Content sections you define — text plus images (floor plans, notices). Rename, reorder, or hide them under "Page sections".
Rename headings, reorder with the arrows, or hide a section.
Sweat equity
Every hour below was donated by a shipmate. This building stands because our people showed up. Bravo Zulu.
Electrical planning
Rev 9 floor plan · flightline side merged to one continuous space. Estimates only — confirm with Public Works before sizing service. Edit the Qty, Watts each, and Demand % fields; totals and service sizing update live. Changes stay on this device and reset on refresh.
| Space / Item | Qty | Watts each | Connected (W) | Demand % | Demand (W) |
|---|---|---|---|---|---|
| TOTAL | — | — |
Yellow-flagged rows carry an assumption worth confirming (e.g. an electric water heater dominates the load if present). Outlets draw 0 W empty — “General receptacles” is a diversified allowance, not the sum of named gear.
Connected: — VA · Demand: — VA
| Voltage | Amps @ connected | Amps @ demand | Rec. main breaker* |
|---|
*Rec. breaker = demand amps × 1.25 (continuous-load headroom), rounded up to the nearest 10 A — a planning guide only, not a substitute for a licensed electrician or a Public Works load study. 3-phase amps are per line.